WISFORDBOSCHSDKIT25/14
Suitable for:
The latest Bosch/TomTom Aus25/NZ14 version now available. |
Price:
Au$199.00
Available and ready to be shipped
|
FORD Bosch MFD | Length of Road Covered |
---|---|
Version 25/14 | 1,523,147 km |
Version 24/13 | 1,509,759 km |
Version 23/12 | 1,459,541 km |
Version 22/11 | 1,329,150 km |
Version 20/9 | 1,318,325 km |
Version 19/8 Whereis Maps | 1,303,570 km |
Pacific Highway upgrade.
Oxley Highway to Kempsey – 37km of Pacific Highway upgraded to 2 lane dual carriageway between north of the Oxley Highway to the south of Kempsey.
Warrell Creek to Nambucca Heads – 16 km of Pacific Highway upgraded to 2 lane dual carriageway bypassing Macksville and Nambucca Heads.
- Added new ‘Phillip Hughes’ Bridge over the Nambucca River.
Halfway Creek to Glenugie – 12km of Pacific Highway upgraded to 2 lane dual carriageway between Grays Road and Franklins Road at Glenugie.
- Added twin bridges over Halfway Creek and Wells Crossing Creek and a new heavy vehicle inspection bay.
Woolgoolga to Halfway Creek – 14km of Pacific Highway upgraded to 2 lane dual carriageway between Arrawarra interchange and Grays Road at Halfway Creek. Added an interchange at Range Road, twin bridges over Corindi floodplain as well as local access bridges over the highway at Sherwood Creek Road and Kangaroo Trail Road.
Foxground and Berry bypass – 12.5km of Princess Highway upgraded to 2 lane dual carriageway between Toolijooa Road and south of Andersons Lane. The upgrade includes a bypass of the existing winding highway at Foxground and a bypass of Berry with access ramps at the north and south of the town.
NorthConnex project.
Construction of a twin 9km dual-lane tunnel linking Sydney’s M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at the existing Pennant Hills Road interchange.
- Trewilga - Newell Highway realignment.
Upgrading and realigning of 6.5km of the Newell Hwy north of Parkes.
- Great Western Highway upgrade at Kelso.
2.8km of highway upgraded to 2 lane dual carriageway along with new shoulder and parking lanes added on both sides of the highway. The intersections upgraded with traffic lights, right turn bays and roundabouts.
- A new wider bridge built across Boyd Creek.
- Schofields Road upgrade and extension Stage 2.
Tallawong Road to Veron Road - An underpass of the Richmond railway line near Schofields train station connecting to Veron Road. Boundary Street, Roseville upgrade.
Widening of Boundary Street on the northern side from the Pacific Highway to Melnotte Avenue and upgrading the intersection of Boundary Street with Pacific Highway and Corona Avenue by adding turning lanes.
Bruce Highway - Boundary Road interchange upgrade.
Added 6-lane bridge over the highway with longer on and off-ramps to improve safety.
- Bruce Highway (Tinana interchange) upgrade.
Added northbound off-ramp to provide a left-hand diverge and provide a new overpass structure with both through lanes of highway traffic travelling under the new overpass
Relocating the Three Mile Road intersection about 300m south of its current location to accommodate the new northbound off-ramp and maintain safe turning movements at the intersection
Removing the southbound off-ramp to Gympie Road due to poor geometry and constructing a new southbound off-ramp to Iindah Road to cater for southbound traffic.
Upgrading the existing southbound on-ramp to improve the merge with the highway by constructing a longer acceleration lane and improving visibility.
Bruce Highway - Cooroy to Curra, Section C.
Torrens Road to River Torrens project extension – grade separation on South Road & Torrens Road and extension of the lowered motorway by 1km.
Midland Highway 10 Year Action Plan.
- This project is dedicated to improving road safety by road widening, extending sealed shoulders, new overtaking lanes, improved junctions, and installing flexible safety barriers to eliminate head-on collisions. Sections completed so far include:
• North and South of Spring Hill
• Kempton to Melton Mowbray Stage 1 & Stage 2
• South of Kempton
• Esk Main Road Junction Conara
• White Lagoon (Tunbridge) to Mona Vale.
CityLink Tulla Widening project.
Mitchell Freeway Extension - Burns Beach Road to Hester Avenue.
Great Northern Highway - Muchea to Wubin Upgrade Stage 2.
NorthLink WA Southern Section upgrade.
Arthur River Project.
Charles Street Bus Bridge and Busway Project